Demarest - County Road and Hardenburgh Avenue Intersection Improvement
- The existing traffic signal will be fully replaced. A northbound left turn phase, eastbound right turn phase, and corresponding arrows, will be implemented. The roadway widths and the lane designations will remain the same. Pedestrian upgrades will include newly constructed ADA compliant ramps and truncated dome mats, count down pedestrian signal heads, audible pedestrian pushbuttons and 10’ wide painted crosswalks. Both roadways within the project limits will be milled and paved, and new striping and signage installed.
Little Ferry - Liberty Street and Redneck Avenue Intersection Improvement
- The existing temporary span wire traffic signal will be replaced with a permanent traffic signal. Opposing left turn lanes with left turn phases and arrows will be implemented on Liberty Street northbound and southbound. A right turn lane will be implemented on southbound Liberty Street. A left turn lane and through/right lane will be implemented on eastbound Redneck Avenue. The existing drainage system will be upgraded with reinforced concrete pipes. Pedestrian upgrades will include newly constructed ADA compliant ramps and truncated dome mats, count down pedestrian signal heads, audible pedestrian pushbuttons and 10’ wide painted crosswalks. Both roadways within the project limits will be milled and paved, and new striping and signage installed.
Contact Us
Joseph A. Femia, P.E.
Director and County Engineer
Phone: 201-336-6805
Joseph Baladi, P.E., P.P., C.M.E.
Planning Division
Division Head
Phone: 201-336-6435
Nancy Dargis, P.E.
Engineering Division
Div. Head and Assistant County Engineer
Phone: 201-336-6805
Bergen County Department of Planning & Engineering
One Bergen County Plaza • 4th Floor • Hackensack, NJ 07601-7076
Phone: 201-336-6446 • Fax: 201-336-6762
Hours: Mon - Fri 8am - 5pm